Sunday, December 22, 2013

Sub-Zero Gets a Makeover

So, one of the things that I really liked (one of the only things) about the old kitchen, was the Sub Zero fridge.  I'm not sure its vintage, but I'd guess late 80s or 90s.  It was glossy black.  It still seemed to work quite well.

I had thought it was one item we would not only keep, but around which we might even re-do the kitchen.

Here is its "before" photo:


I kind of liked the glossy black of it.  Everyone has stainless these days, I thought it looked pretty cool. As we got to designing the kitchen, though, and picking colors, it made less and less sense to let that one thing drive all other choices.  Eventually, we were just going to "live with" the black color as a slightly mismatched aspect of the kitchen.

It would have looked like this:


It wouldn't have been horrible, but not totally ideal, either.

Mid-renovation, however, I discovered that Sub-Zero sold replacement panels for these fridge models in a variety of colors -- black, stainless, white, etc.

Given that we had picked the glossy white cabinet fronts for all of our lowers, I thought that a glossy white might work well.  This wouldn't be a "white kitchen" circa 1993 with a low-end, painted metal, all white fridge.  It would be a white Sub-zero with small stainless details, trim, and handles.  I checked online and it turned out that Sub-zero made these panels themselves.  I ordered the glossy white. And, last night, I installed them.

I had been dreading putting them in, suspecting that I'd have to disassemble the fridge in a manner similar to disassembling a MacBook, with a million screws, moving a battery out of the way, unsnapping plastic fasteners, etc.  It turned out, though, to be a breeze.  Seven screws in all.

Here are the panels in the box and then pulled from the box on the kitchen floor:



There's a magnetic strip that cover the screws holding the upper door and the lower freezer door in place:


With those screws removed, the handles came right off and the panels just slid out:


The panels were 1/8" acrylic plexiglass.  Probably not proprietary to Sub-zero. In hindsight, we probably could have just painted these, or bought "after market" white acrylic. The ones we ordered from Sub-zero were powder-coated metal. They used two pieces of the packing cardboard as filler to make them as thick as the acrylic.

Its not hard to see how easy it is for Sub-zero to "customize" their fridge to match cabinets and make them blend in with anyone's existing custom cabinets.

As for us, after sliding them in and re-attaching the handle, we had a "new" fridge:




Wednesday, December 18, 2013

Under and Over Cabinet Lighting Installed

Not a huge update here, but the electrician was back at the house yesterday and installed / completed both the under and over cabinet lighting as well as the "can" / LED lighting.

Between removing the paper covering the floors and installing the lights, there is a pretty massive difference from a few days ago.

Here it is last night -- floor paper removed and lights working (overhead / can / LEDs not on).

The soffit for the range hood is being constructed and the Sub Zero is getting a makeover from black to white.  Finally, backsplash tile will be installed.

We are getting closer, though.


Compared to a similar view (floor paper and cardboard in place, overheads only -- with CFLs, not LEDs -- and no cabinet lighting present, also, without counter tops and range hood installed).


HUGE difference, imo.

Will post some laundry room and mud room photos soon.

Friday, December 13, 2013

Mud Room / Laundry Room / Powder Room Are Getting their Tile

Over the last few days, tile has been going in three areas that didn't get the White Oak.  As noted in this scheme, they are the "brick pattern" areas:


This area had largely been a mess / holding area for a long time.  When we moved in, I insisted (at my wife's insistence) that the washer and dryer go in on at least a temporary basis so we'd have those functions.  The lived, where they will permanently live, in the far right portion of the tiled area, just below the new half bath.

Monday, they moved from the temporary / permanent residence and a lot of junk moved out also, to make room for the new tile we were had picked out.  They are the large 12" x 24" big bricks that are more popular these days.  According to my receipt, it is "Europa Grigio" Floor Tile, which sounds more like a wine than a tile to me, but what do I know. I'm not positive, but I think its this tile here:


So, it started going in:


There's looking from the kitchen back to the garage.  This is as deep as they got on Day 1 -- but this is deceptive, because they made it all the way down the hall and into the laundry room and powder room, as seen below. In looking at this and the original drawings, it looks like somewhere along the line, we carried the hardwood floor into this gap covered by cardboard, whereas the original drawings had it being tiled up to the edge of the cabinets.


Down to hall to the laundry room (above).


From the laundry room, looking through the powder room into the living room (Christmas tree in the background).



The hallway completed to the wall.


The laundry room.


From the living room, looking back to the laundry room closet.

Monday, December 9, 2013

Photo Dump / Update

Being on trial last week (secured a nice victory for our pro bono client via jury verdict) and the week prior being our move-in and Thanksgiving weekend, I haven't had much chance to do proper posts.  There are many proper updates coming, but folks have been asking for photos, so here is a dump (forgive the mess and forgive the sloppy photos).

Visually speaking the only big change here (besides de cluttering and some area rugs), are three pendants installed above the island (the orange boxes you see on the counter top).


Looking over the island to the LR/DR.


Same shot.


Same again.


Looking from the play room / family room.


Looking straight down the LR/DR.


Same.


Same from other corner, in front of the fireplace.


Looking back towards kitchen and family room from corner of the LR/DR.

Thursday, December 5, 2013

Counters Went In - Serious %$#-ing Drama!

We've finally got kitchen counters.  Tomorrow water in the kitchen.  There's been a lot going on this week since Thanksgiving.  But I've been on trial and way busier than usual..

Only one photo from last night -- Sylvester and his crew putting in sink holes.  Great view, though, of the full island wrap and the counters in the back.


Better photos coming soon -- hopefully in daylight.